Plan a pouch-filling evaluation with production materials, fill and closure measurements, timed output, acceptance criteria and sample handling.

Empty and filled pouches on separate scale platforms illustrating tare and gross weight.
Agree the tare method, target and fill limits before weighing the sample run.

A sample evaluation checks the dosing and closure requirements with your production product and pouch. We agree the equipment, measurement method, acceptance criteria, schedule and fees for the evaluation before it starts.

[01]

What We Evaluate

Testing helps most when something is likely to cause trouble:

  • Sticky, dusty, fragile or poorly flowing products
  • Liquids with particles, high viscosity or foaming
  • A new film or a new pouch
  • Tight weight or fill tolerances
  • Two filling approaches you want to compare

If your product doses easily and your pouch is a common one, reviewing drawings and samples may be enough. Ask us which applies. For powders, see powder pouch filling. For liquids and pastes, see liquid pouch filling and sauce pouch filling.

Define the failure to investigate, such as powder reaching the seal faces during filling. Evaluate how to keep the seal area clear, then measure seal performance using the agreed method and acceptance limits.

[02]

Information to Send

Start with a short project description.

ItemDetail
ProductName, form, and what worries you (stickiness, dust, particles, viscosity)
TargetNet weight or volume, tolerance, speed
PouchType, size, material, closure, any zipper or spout
QuestionWhat the evaluation must answer, such as seal quality or fill consistency
HazardClassification, with an SDS where it applies

The pouch specifications guide lists the dimensions worth measuring.

Front and opened side views with outside width, height and bottom-depth arrows.
Identify the production pouch lot and measurement convention. The sample drawing and actual pouch should use the same reference edges.

[03]

Sample Quantities and Shipping

Agree sample quantities and the shipping address with the team first. The evaluation scope determines how much product and packaging material is needed.

Send product from a production lot and pouches made to the production specification. Substitutes can give results that don't apply to your real project. If the product is hazardous, include the SDS before shipping.

[04]

Trial Scope

Agree the scope before testing starts: which configuration, which settings, and how results are measured. Settle the measurement method first, including how weight is checked, how many packs are sampled and what counts as acceptable. Without that, the numbers are hard to compare with your tolerance.

The evaluation plan identifies the equipment to use and the product and pouch lots. Keep those identifiers with the report for comparison during factory acceptance and production.

Clock above accepted finished pouches, with a rejected pouch separated from the count.
Agree whether output means all formed pouches or accepted finished pouches over the timed run. Record stoppages and reject handling with the result.

[05]

Reporting and Acceptance

A test record should state the product, the packaging material, the configuration, the settings and what was observed. A record without those is incomplete.

Assess the results against the agreed material, configuration, run duration and output conditions. Carry the accepted criteria into the machine specification and FAT plan. The filling accuracy guide covers how to assess accuracy.

[06]

Fees and Scheduling

Fees, schedule and location are confirmed with the team. If a cost applies, it should appear in your proposal. See service and support for how the project process fits together, and the price guide for how costs are handled in a quotation.

To compare two approaches, say so at the start. Judge both on the same product lot, the same pouch and the same measurement method, or the comparison tells you little.

[07]

Submit Your Project

Use the project description above to define the evaluation question and proposed measurements. Message us on WhatsApp, or write through the contact page.

[Request]

Start a Sample Evaluation

Discuss the equipment scope and next steps with the LINEVO team.